The Retreat — Asphalt Reclamation In-Place
San Marcos, Texas — Near Texas State University
132K
SF Surface Reclaimed
$450K
Saved vs. Full Excavation
21
Working Days, 3 Phases
Scope of Work
- 132,000 SF severely distressed asphalt at a 285-unit apartment complex — ground swell & water infiltration had failed the clay/limestone sub-grade across a 20–30 ft elevation change
- Lab testing determined 6" subbase infusion was optimal — eliminating 18" full excavation, Geo-grid installation, and ~1,000 truckloads of material haul-off
- Wirtgen 200 series machine dosed T-PRO® polymer precisely per on-site material testing; cured 12–24 hrs before 1.5" asphalt topcoat
- Completed in 3 phases (~1 week each) with the complex at full occupancy throughout — zero resident displacement
$450,000 Saved · 800–1,200 PSI Subbase · ~1,000 Truckloads Eliminated
Resilient polymer subbase (800–1,200 PSI dry / 350–450 PSI wet) delivered in 21 days while the complex remained fully occupied.