Skip to main content

Dust compliance
isn't optional.
We handle it.

Get compliant in days. Stay compliant for years.

EPA PM10 / PM2.5

Particulate matter standards for construction and unpaved road operations

OSHA 1926

Worker silica & respirable dust standards on construction sites

MSHA Part 70

Mine Safety dust control for active mining operations

Texas TCEQ

State air quality requirements for all dust-generating operations in Texas

Dust Suppression — In the Field

Projects Where T-PRO® Controlled the Dust

Start Your Project →
C-130 forward assault strip stabilization, Saudi Arabia — T-PRO® polymer airfield Military

C-130 Forward Assault Strip Stabilization

📍 Saudi Arabia — Remote Forward Operating Environment
670K
SF Airstrip Stabilized
20
Working Days End-to-End
8"
Polymer Infusion Depth
Scope of Work
  • 670,000 SF temporary forward assault strip in remote desert — required to support C-130 heavy-lift and F-16 fighter operations from native in-situ soil
  • Proprietary polymer soil stabilization applied directly to existing soil, creating a hardened, high-bearing-capacity, abrasion-resistant wearing course
  • Black colorant added for high-visibility runway markings; zero imported aggregate required
  • Zero-footprint removal protocol on mission end; maintenance follows standard military protocol for polymer-stabilized surfaces
🪖
DoD-Certified · C-130 & F-16 Capable · Brown-Out Eliminated Delivered on schedule using only local soil — rapid deployability proven for expeditionary forward operating bases.
T-PRO® stabilized Chilean iron ore mine haul road — Caterpillar 785B haul truck on treated surface Mining

Iron Ore Mine Haul Road Stabilization & Dust Control

📍 Chile — Iron Ore Open-Pit Mine
10km
Haul Road Network Treated
23%
Fuel Cost Reduction
90%
Water Use Reduction
Scope of Work
  • 10 km (250,000 m²) of high-traffic haul roads serving Caterpillar 785B trucks hauling 137.5-tonne iron ore payloads
  • T-PRO® polymer stabilization reduced rolling resistance from 6–9% down to 3%, cutting fuel burn and accelerated tire wear
  • 90% reduction in water consumption and 75% reduction in spray fleet — ongoing maintenance costs slashed
  • 70% reduction in grading frequency; brake tests confirmed significantly higher braking resistance on treated surface
⛏️
23% Fuel Savings · 18% Longer Tire Life · 7× Compressive Strength TTI-validated 7× compressive strength gain transformed a major cost center into a high-availability, profit-driving haul road.
Helicopter landing pad stabilization, Casar de Cáceres Spain — T-PRO® polymer wear course Military / Aviation

Helicopter Landing Pad — High-Performance Polymer Wear Course

📍 Casar de Cáceres, Spain
0
Imported Aggregate Required
FOD
Eliminated at Surface
Long-Term Performance Proven
Scope of Work
  • Decomposed granite and native in-situ soils milled and blended with T-PRO® polymer, then compacted in place — no imported fill material
  • Pressurized topical seal coat applied to create a bonded wear course with exceptional particle interlocking between coarse and fine materials
  • Surface engineered to withstand intense rotor wash, wind erosion, and repeated helicopter operations while eliminating FOD hazards
  • Continues to demonstrate outstanding long-term performance — a low-maintenance alternative to concrete or imported aggregate pads
🚁
Native Soil → Rotor-Wash-Resistant Aviation Surface Rapid construction using local materials; proven for forward-operating, remote, and expeditionary aviation environments.

Railway Sand Drift Abatement

📍 Abqaiq, Saudi Arabia — Arabian Desert
200 km
Berms specified by SRO
100+ mph
Wind resistance tested
12:1
Water-to-polymer ratio

T-PRO® replaced crude-oil stabilization along high-traffic Saudi Rail Organization lines, locking sand berms against 100+ mph desert winds. Performance was so decisive that SRO issued an exclusive specification covering 200 km of protective berms — cutting clearing frequency from monthly to annual reapplication.

Erosion Control Wind Stabilization Rail Infrastructure
Solar farm access road dust control, Phoenix Arizona — T-PRO® polymer seal coat Energy

Solar Farm Access Road — Fugitive Dust Control

📍 Phoenix, Arizona — Major Photovoltaic Plant
70K+
Heavy Truck Movements
18mo
Construction Phase Covered
0
Harmful Chemistry — Carbon-Neutral
Scope of Work
  • Newly constructed gravel access road serving a major photovoltaic solar plant — required to handle 70,000+ heavy truck movements over an 18-month build phase
  • T-PRO® applied as a topical polymer seal coat at 70 ft²/gal to bind surface fines and lock down fugitive dust under extreme desert heat
  • Full bearing capacity maintained through winter and summer cycles; no structural integrity or drainage compromise
  • Carbon-neutral, FDA-approved formulation met strict environmental requirements for sensitive solar energy infrastructure
☀️
Excellent Dust Control · 70,000+ Truck Movements · Zero Environmental Impact Reliable all-weather performance in extreme desert conditions — on-spec from first coat to final handover.